Clean Finish Electrical · Serving Dana Point since 2016
Your electrician in Dana Point.
Dana Point is twenty to thirty minutes from me, and its homes sit close enough to the harbor and the beaches that salt air is part of every exterior job.
Texting is fastest. Brian usually answers within the hour during the day.
What I see in Dana Point homes
Dana Point is one city made from three older communities. When it incorporated on January 1, 1989, it took in parts of Dana Point, Capistrano Beach, and Monarch Beach, each of which had been building for decades. The Lantern neighborhoods, with streets named for the colored lanterns ships once carried, were the start, and Capistrano Beach lots were being bought up for development from 1928. Most of the city came in the decades after World War II, and the harbor was built in the 1960s and dedicated in 1971.
The city's own hazard plan notes that several older neighborhoods, Capistrano Beach in particular, hold homes built before modern seismic codes. A house that predates today's seismic rules usually predates today's electrical code too, and it tends to show: a service sized for a smaller house, a panel with every space filled, ungrounded circuits in the original rooms, and additions tied into whatever circuit was closest. On the bluffs and the hillsides, long runs from the meter and panels mounted on exterior walls add to that list.
Salt air is the constant here. Meter and panel enclosures, exterior outlets, landscape lighting, and pool and spa equipment corrode from the outside in, and the damage often starts at a connection nobody can see. For a house above the beach or near the harbor I plan exterior work around that exposure, with sealed, coast-rated boxes and fixtures, hardware that resists rust, and connections I can get back to later.
Newer and remodeled houses, from Monarch Bay to Niguel Shores and the streets around the Lantern District, tend to need additions rather than repair: lighting design, landscape and path lighting, spa circuits, a charger in the garage, and cameras. The city's hazard plan also notes a growing number of accessory dwelling units, and a new unit usually means a subpanel and sometimes a larger service at the main house.
Permits in Dana Point
Dana Point's Permit Center at City Hall, 33282 Golden Lantern, issues electrical permits along with building, pool and spa, and solar permits, and every application goes through the city's eTRAKIT portal. I submit the application, schedule the inspection, and am on site for it. Development in the city's Coastal Zone generally needs a Coastal Development Permit unless it is exempt, so for an addition, an ADU, or new work outside the house I check with the city's planners early about whether one applies. Dana Point is on San Diego Gas & Electric's system rather than Edison's, so when a main service upgrade calls for a disconnect and reconnect, I schedule it with SDG&E.
What I do in Dana Point
If electricity goes to it or through it, I do it.
Troubleshooting and repair
Dead outlets, tripping breakers, half the house out. Found and fixed, usually the same day.
Panels and service upgrades
Sub-panels, 200-amp main service, and the call to your utility, Edison or SDG&E, when the problem is on their side.
EV chargers
Tesla and every other charger, hardwired or 50-amp outlet, permit pulled and inspected.
Lighting and design
Recessed, pendants, under-cabinet LED, dimmers, fans. Aligned to the room, not just to the joist.
Pool and outdoor
Pool pumps, lights, GFCI, automation, patio and landscape lighting that survives the weather.
Smart home and cameras
Ring, Nest, doorbell cameras, smart switches, and the wiring that makes them reliable.
Reviews
What customers nearby say.
He installed a 50-amp outlet and a hardwired Level 2 EV charger, plus three ceiling fans. On time, and he returns calls and texts.
A home-warranty electrician wanted to cut the drywall to find a "missing neutral." Brian found the real problem in 30 minutes without cutting the wall: a loose neutral in the main panel that had burned. Best in the business. He knows his stuff.
New house, and he changed all the plugs to GFCI. Done within an hour.
Punctual, honest, and quick. He saved me hundreds and cleaned up the work site. The best electrician.
Questions from Dana Point
Does my Dana Point project need a Coastal Development Permit?
It depends on where the house is and what the project is. Development in the city's Coastal Zone generally needs one unless it is exempt. I ask the city's planners about your specific project before we set dates, so the permits happen in the right order.
Why does my Capo Beach meter box look rusted?
Salt air. Meter and panel enclosures near the water corrode from the outside, and once rust gets through, moisture reaches the connections. I check whether it is cosmetic or structural. If the enclosure needs replacing, it is service work that involves SDG&E and a permit, and I handle both.
Who do I call when the power goes out in Dana Point, SDG&E or Edison?
San Diego Gas & Electric serves Dana Point, so if the whole street is dark, check their outage information first. If the neighbors have power and you do not, call me; I find out whether the problem is on your side of the meter or the utility's, and deal with SDG&E if it is theirs.
Also serving Lake Forest, Mission Viejo, Irvine, Laguna Hills, Laguna Niguel, Aliso Viejo, Newport Beach, Laguna Beach, Rancho Santa Margarita, Tustin, Costa Mesa, San Juan Capistrano, Santa Ana, and the rest of Orange County.
Request a quote
Tell Brian what is going on.
Fastest: text a photo to (949) 357-6448. The form below works too, but allow 24 to 48 hours for a reply.
Texting is fastest. Brian usually answers within the hour during the day.