Skip to content Skip to request a quote

Clean Finish Electrical · Serving Irvine since 2016

Your electrician in Irvine.

Irvine is fifteen to twenty minutes from me, and it runs from 1960s houses in University Park and Turtle Rock to homes near the Great Park that are only a few years old.

Text a photo of the problemCall (949) 357-6448

Texting is fastest. Brian usually answers within the hour during the day.

What I see in Irvine homes

Irvine is a city of villages, and each one belongs to its own decade. University Park opened in 1966, a year after UC Irvine, and Turtle Rock followed in 1967 as the first hillside village. The first phases of Turtle Rock, University Park, and Westpark, which was called Culverdale at the time, were finished by 1970, the year Northwood began, and the city incorporated in 1971. Woodbridge was started in 1975 and mostly built out by the mid-1990s. Portola Springs came in 2006, and the Great Park neighborhoods, on the old El Toro Marine Corps Air Station, are the newest of all.

That spread means two very different sets of needs. In the original villages the houses are more than fifty years old, and they commonly have panels of that era with no room left, ungrounded outlets in the older rooms, and kitchens and baths that were remodeled for looks without the wiring ever being brought up to date. A Turtle Rock or University Park kitchen remodel is often the right moment to add the circuits a modern kitchen actually needs.

Woodbridge and Northwood are younger but still past forty, and at that age the usual needs are worn switches and receptacles, bath fans that have given up, and lighting owners want to replace with something better. In Portola Springs and around the Great Park the wiring is new, so what those homes need is additions: a Level 2 charger in the garage, a circuit for a garage refrigerator or a home gym, under-cabinet lighting, and cameras wired in properly instead of hanging off a plug.

The other thing to know about Irvine is the homeowners' associations. Many village neighborhoods have one, and they control how the outside of a home looks, so an exterior light, a camera on the eave, or a charger on an outside wall may need architectural approval before it goes up. Parts of the older Northwood tracts were built without an association, so the rules really do change from street to street.

Permits in Irvine

Irvine's electrical permits are handled by Building and Safety, part of the Community Development Department at City Hall, 1 Civic Center Plaza. Permits that do not need plan check are applied for online through the city's PermitsDIRECT portal; bigger jobs go through plan check first. I pull the permit, book the inspection, and stay for it. The city permit and your HOA's approval are two separate things, and for exterior work I help you put together what the association asks for and wait for its answer before I start. Irvine's utility is Southern California Edison; a main service upgrade means coordinating the disconnect and reconnect with them, which I build into the schedule.

Reviews

What Irvine customers say.

I did not feel like he was trying to trick me or pull a fast one. Honest, fair, and good to work with.

Casey, Irvine · Yelp

I got thirteen quotes for this job. Clean Finish Electric was the only one who answered my questions correctly. He pulled the city permit himself. Then he took money off the bill on his own.

Roger, Irvine

Questions from Irvine

Does my Irvine HOA have to approve an EV charger?

It depends on your association's rules and on where the charger goes, so read them first. If it goes on an exterior wall or in a common area, expect an application. California law (Civil Code section 4745) says an association cannot effectively prohibit a charger, but it can set reasonable conditions and require a licensed contractor. I can give you the details the application needs.

My Turtle Rock house was built in the late 1960s. What should I have checked?

Start with the panel and the grounding. I open the panel, look for overheated breakers and loose connections, test the outlets for ground and polarity, and look over any past remodel work. You get a straight list: what is fine, what should be fixed, and what can wait.

My new Great Park home came with a bare garage. What can you add?

Most of what people want out there: a Level 2 charger, a dedicated circuit for a second refrigerator or a freezer, more outlets along the workbench wall, and better lighting. Send me a photo of the panel and its label and I will tell you what fits before I come out.

Request a quote

Tell Brian what is going on.

Fastest: text a photo to (949) 357-6448. The form below works too, but allow 24 to 48 hours for a reply.

Text a photo of the problemCall (949) 357-6448

Texting is fastest. Brian usually answers within the hour during the day.

Three things are required: your name, your phone, and what is going on. The rest is optional.

Replies to the form can take 24 to 48 hours. A text is faster.